Jump to content

Rashtreeya Vidyalaya Road metro station

Coordinates: 12°55′17″N 77°34′49″E / 12.921458°N 77.580375°E / 12.921458; 77.580375
From Wikipedia, the free encyclopedia

Rashtreeya Vidyalaya Road
Namma Metro station
The station as on December 2024
General information
Other namesR. V. Road, Rashtreeya Vidyalaya Raste, R. V. Raste, Jayanagara 5th Block, Jayanagar 5th Block
LocationRashtreeya Vidyalaya Road, 5th Block, Jayanagar, Bengaluru, Karnataka 560041
Coordinates12°55′17″N 77°34′49″E / 12.921458°N 77.580375°E / 12.921458; 77.580375
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Green Line Yellow Line
PlatformsSide platform

Platform-1Madavara
Platform-2Silk Institute
Platform-3 → Train Terminates Here
Platform-4Delta Electronics - Bommasandra
Platform numbers (TBC)

Tracks2 + 2 (Awaiting Trainsets)
ConnectionsMetro interchange Upcoming Yellow Line
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Disabled access
Architect  IVRCL Ltd.
  HCC - URC Construction JV
Other information
StatusStaffed
Station codeRVR
History
Opened  18 June 2017; 7 years ago (2017-06-18)
Opening  July 2025; 60 days' time (July 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Jayanagar
towards Madavara
Green Line Banashankari
Terminus Yellow Line
(Operational around July 2025)
Ragigudda
towards Bommasandra
Location
Map

Rashtreeya Vidyalaya Road is an elevated interchange metro station on the north–south corridor of the Green Line and the east–west corridor of the upcoming Yellow Line of Namma Metro serving the 5th and 8th Block of Jayanagar area of Bangalore, India. It was opened to the public on 18 June 2017.[1]

As per latest reports, the Yellow Line is slated to be operational around July 2025[2][3][4] instead of May 2025[5][6][7] which was announced by the Namma Metro Managing Director, Maheshwar Rao, previously mentioned by Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.

History

[edit]

Yellow Line

[edit]

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the terminal metro station (Rashtreeya Vidyalaya Road) along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[8] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

[edit]
Rashtreeya Vidyalaya Road track layout
P1
P2
Station with two tracks and two side platforms
Rashtreeya Vidyalaya Road track layout **
to Train Terminates Here
P#
P#
Station with two tracks and two side platforms
** (Final Stages before Operations)
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute
Next Station: Banashankari
Platform 1
Northbound
Towards ← Madavara
Next Station: Jayanagar
Island platform | P1 & P# doors will open on the left Disabled access
Yellow Line Station Layout & Platform Numbers - (TBC)
Platform #
Southbound
Towards → Delta Electronics - Bommasandra
Next Station: Ragigudda
Platform #
Northbound
Towards ← Train Terminates Here
Side platform | Doors will open on the left Disabled access
L2
[edit]

Some of this metro station pictures are shown below:-

Entry/Exits

[edit]

There are 2 Entry/Exit points – A and B. Commuters can use either of the points for their travel.

  • Entry/Exit point A: Towards Jayanagar 5th Block side
  • Entry/Exit point B: Towards Jayanagar 7th/8th Blocks side with wheelchair accessibility

See also

[edit]

References

[edit]
  1. ^ "Nagasandra-Puttenahalli Metro line to open by May-end, says KJ George". The Times of India. 3 May 2017. Retrieved 2 July 2017.
  2. ^ "Bengaluru Namma Metro Update: Yellow Line Operations To Start In June | Check Status, Key Stations". English Jagran. 6 April 2025. Retrieved 6 April 2025.
  3. ^ "Bengaluru Metro Yellow Line: Operations To Start By June? Check Current Status & Key Stations". Times Now. 5 April 2025. Retrieved 6 April 2025.
  4. ^ Parangi, Shankrappa (6 April 2025). "Namma Metro Yellow line: ಏಪ್ರಿಲ್ ಅಂತ್ಯಕ್ಕೆ 3ನೇ ರೈಲು, ಹಳದಿ ಮಾರ್ಗ ಕಾರ್ಯಾಚರಣೆ ಅಪ್ಡೇಟ್". kannada.oneindia.com (in Kannada). Retrieved 6 April 2025.
  5. ^ "Bengaluru Metro Yellow Line To Become Operational By May 2025, Pink Line To Be Ready For Public Use By..." Times Now. 11 March 2025. Retrieved 12 March 2025.
  6. ^ "Bengaluru: Namma Metro Yellow Line From RV Road To Bommasandra, Connecting Electronics City, Set To Open By May 2025". English Jagran. 10 March 2025. Retrieved 12 March 2025.
  7. ^ "Bengaluru Metro plans to open yellow line in April with 4 trains, 30-min headway". Deccan Herald. Retrieved 7 January 2025.
  8. ^ "HCC-URC JV Lowest Bidder for Bangalore Metro's RV Rd - HSR Layout". The Metro Rail Guy. 16 May 2017. Retrieved 23 October 2024.
[edit]