Tehran Metro Line 7
Appearance
Tehran Metro Line 7 | |||
---|---|---|---|
![]() | |||
Overview | |||
Native name | خط ۷ مترو تهران | ||
Owner | Tehran Urban and Suburban Railways Organization (Metro) | ||
Locale | Tehran, Tehran Province | ||
Termini | |||
Stations | 21 | ||
Service | |||
Type | Commuter rail | ||
System | Tehran Metro | ||
Operator(s) | Tehran Urban and Suburban Railways Organization (Metro) | ||
Depot(s) | Takhti Depot | ||
History | |||
Opened | June 10, 2017 (initial) July 14, 2018 (middle section) March 16, 2019 (Northern section) August 19, 2019 (Eastern section) | ||
Technical | |||
Line length | 22.5 km (14.0 mi) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
Electrification | 25 kV AC overhead catenary | ||
|
Line 7, similar to Line 6, and in contrast with Line 3, goes from northwest to southeast and was constructed with modern TBM machines. Its first phase, consisting of 18 km (11 mi) of line and 7 stations, was opened in June 2017.[2] This line has 22.5 km (14.0 mi) with 21 stations right now.[3]
Route
[edit]References
[edit]- ^ "متروی تهران: تاریخچه مترو". Archived from the original on 25 September 2011. Retrieved 13 December 2014.
- ^ First parts of Tehran metro Line 7 inaugurated Archived 2017-06-15 at the Wayback Machine www.tehran.ir Official Tehran's website. June 2017
- ^ "مشخصات خط هفت متروی تهران - ایستگاهها". Tehran Urban and Suburban Railways Organization.