Shenjing station
![]() Platform | |||||||||||
Chinese name | |||||||||||
Chinese | 深井站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Jinzhou South Road (金洲南路), Shenjing Village (深井村), Changzhou Island, Changzhou Subdistrict Huangpu District, Guangzhou, Guangdong China | ||||||||||
Coordinates | 23°04′16″N 113°24′14″E / 23.071011°N 113.403819°E | ||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
Line(s) | Line 7 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | 710 | ||||||||||
History | |||||||||||
Opened | 28 December 2023 | ||||||||||
Services | |||||||||||
|
Shenjing Station (Chinese: 深井站; pinyin: Shēnjǐng Zhàn; Jyutping: sam1zeng2 zaam6) is a station of Guangzhou Metro Line 7, located underground at Jinzhou South Road within Shenjing Village on Changzhou Island in Guangzhou's Huangpu District.[1] The station opened on 28 December 2023, with the opening of Phase 2 of Line 7.[2]
It is the station on the Phase 2 extension that takes up the most land area.[3]

Station layout
[edit]G | Street level | Exits A, C, D |
L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
- | Reserved transfer interface to Higher Education Mega Center East station | |
L2 Platforms |
Platform 2 | ![]() |
Island platform, doors will open on the left | ||
Platform 1 | 7 towards Yanshan (Changzhou) ![]() |
Exits
[edit]Exit letter | Gallery | Exit location | Nearby | ||
---|---|---|---|---|---|
A | ![]() |
Jinzhou Road South | Shenjing Public Bus Stop (Northbound) | ||
C | ![]() |
Jinzhou Road South | Wenta Park | ||
D | ![]() |
Jinzhou Road South | Shenjing Public Bus Stop (Southbound) |
History
[edit]In February 2022, the main structure of the site was topped out.[4] In August the same year, the right line tunnel boring machine between the Higher Education Mega Center South middle wind shaft and the station broke through, marking the realization of a double-line breakthrough in the tunnel between the station and Higher Education Mega Center South Station.[5] The station completed the "three powers" transfer in October 2023.[6] At 12:00 on December 28, the station was put into use with the opening of Line 7 Phase 2.[2]
Future development
[edit]The Pazhou branch of the Guangzhou–Shenzhen intercity railway under construction has a Higher Education Mega Center East Station on the southeast side of the station,[7] which is connected to the concourse through a long-distance transfer passageway, and there will be moving pedestrian walkways within the passage.[2]
References
[edit]- ^ a b "深井". Guangzhou Metro (in Simplified Chinese). Guangzhou Metro.
- ^ a b c "广州地铁七号线二期和五号线东延段开通运营,长洲岛派出舞狮喜迎开通" [Guangzhou Metro Line 7 Phase II and Line 5 East Extension opened for operation, and Changzhou Island sent out lion dance to welcome the opening]. Xin Kuai Bao (in Simplified Chinese). 2023-12-28. Archived from the original on 2023-12-28. Retrieved 2024-01-05.
- ^ "广州地铁七号线二期将于今年年底开通,深井站机电安装冲刺中!" [The second phase of Guangzhou Metro Line 7 will be opened at the end of this year, and the mechanical and electrical installation of Shenjing Station is in the final stages!]. Yangcheng Evening News (in Simplified Chinese). 2023-04-27. Archived from the original on 2023-04-27. Retrieved 2024-01-05.
- ^ 李天研 (2022-02-15). "进度条再更新!广州地铁七号线二期、十号线又有车站封顶" [Progress bar updated again! Guangzhou Metro Line 7 Phase 2 and Line 10 have another station capped]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2023-01-22.
- ^ ""贯通+封顶"七号线二期完成两目标" ["Through-connected + capped" Phase 2 of Line 7 achieves two goals]. Guangzhou Metro (in Simplified Chinese). 2022-08-15. Archived from the original on 2023-01-22.
- ^ "决战决胜四季度丨转交"金钥匙",中铁北京局承建的广州地铁七号线二期车站完成"三权移交"" [Decisive battle for victory in the fourth quarter丨Handing over the "golden key", the second phase of Guangzhou Metro Line 7 station constructed by China Railway Beijing Engineering Bureau completed the "three rights transfer"]. China Railway Beijing Engineering Bureau No. 2 Company (in Simplified Chinese). 2023-12-28. Archived from the original on 2023-11-06. Retrieved 2024-01-05.
- ^ 杜娟 (2018-06-02). "穗莞深城际琶洲支线开始环评公示" [The environmental impact assessment of the Guangzhou-Shenzhen-Dongguan intercity Pazhou branch line has been made public]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2023-01-22 – via Sina Corporation.