Shenjing station

Coordinates: 23°04′16″N 113°24′14″E / 23.071011°N 113.403819°E / 23.071011; 113.403819
From Wikipedia, the free encyclopedia
Shenjing

深井
Guangzhou Metro
Platform
Chinese name
Chinese深井站
Transcriptions
Standard Mandarin
Hanyu PinyinShēnjǐng Zhàn
Yue: Cantonese
Jyutpingsam1zeng2 zaam6
General information
LocationJinzhou South Road (金洲南路), Shenjing Village (深井村), Changzhou Island, Changzhou Subdistrict
Huangpu District, Guangzhou, Guangdong
China
Coordinates23°04′16″N 113°24′14″E / 23.071011°N 113.403819°E / 23.071011; 113.403819
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 7
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code710
History
Opened28 December 2023; 14 months ago (2023-12-28)
Services
Preceding station Guangzhou Metro Following station
Higher Education Mega Center South
towards Meidi Dadao
Line 7 Changzhou
towards Yanshan

Shenjing Station (Chinese: 深井站; pinyin: Shēnjǐng Zhàn; Jyutping: sam1zeng2 zaam6) is a station of Guangzhou Metro Line 7, located underground at Jinzhou South Road within Shenjing Village on Changzhou Island in Guangzhou's Huangpu District.[1] The station opened on 28 December 2023, with the opening of Phase 2 of Line 7.[2]

It is the station on the Phase 2 extension that takes up the most land area.[3]

Concourse

Station layout

[edit]
G Street level Exits A, C, D
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities
- Reserved transfer interface to Higher Education Mega Center East station
L2
Platforms
Platform 2 arrow for L  7  towards Meidi Dadao (Higher Education Mega Center South)
Island platform, doors will open on the left
Platform 1  7  towards Yanshan (Changzhou) arrow for R

Exits

[edit]
Exit letter Gallery Exit location Nearby
A Jinzhou Road South Shenjing Public Bus Stop (Northbound)
C Jinzhou Road South Wenta Park
D Jinzhou Road South Shenjing Public Bus Stop (Southbound)

[1]

History

[edit]

In February 2022, the main structure of the site was topped out.[4] In August the same year, the right line tunnel boring machine between the Higher Education Mega Center South middle wind shaft and the station broke through, marking the realization of a double-line breakthrough in the tunnel between the station and Higher Education Mega Center South Station.[5] The station completed the "three powers" transfer in October 2023.[6] At 12:00 on December 28, the station was put into use with the opening of Line 7 Phase 2.[2]

Future development

[edit]

The Pazhou branch of the Guangzhou–Shenzhen intercity railway under construction has a Higher Education Mega Center East Station on the southeast side of the station,[7] which is connected to the concourse through a long-distance transfer passageway, and there will be moving pedestrian walkways within the passage.[2]

References

[edit]
  1. ^ a b "深井". Guangzhou Metro (in Simplified Chinese). Guangzhou Metro.
  2. ^ a b c "广州地铁七号线二期和五号线东延段开通运营,长洲岛派出舞狮喜迎开通" [Guangzhou Metro Line 7 Phase II and Line 5 East Extension opened for operation, and Changzhou Island sent out lion dance to welcome the opening]. Xin Kuai Bao (in Simplified Chinese). 2023-12-28. Archived from the original on 2023-12-28. Retrieved 2024-01-05.
  3. ^ "广州地铁七号线二期将于今年年底开通,深井站机电安装冲刺中!" [The second phase of Guangzhou Metro Line 7 will be opened at the end of this year, and the mechanical and electrical installation of Shenjing Station is in the final stages!]. Yangcheng Evening News (in Simplified Chinese). 2023-04-27. Archived from the original on 2023-04-27. Retrieved 2024-01-05.
  4. ^ 李天研 (2022-02-15). "进度条再更新!广州地铁七号线二期、十号线又有车站封顶" [Progress bar updated again! Guangzhou Metro Line 7 Phase 2 and Line 10 have another station capped]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2023-01-22.
  5. ^ ""贯通+封顶"七号线二期完成两目标" ["Through-connected + capped" Phase 2 of Line 7 achieves two goals]. Guangzhou Metro (in Simplified Chinese). 2022-08-15. Archived from the original on 2023-01-22.
  6. ^ "决战决胜四季度丨转交"金钥匙",中铁北京局承建的广州地铁七号线二期车站完成"三权移交"" [Decisive battle for victory in the fourth quarter丨Handing over the "golden key", the second phase of Guangzhou Metro Line 7 station constructed by China Railway Beijing Engineering Bureau completed the "three rights transfer"]. China Railway Beijing Engineering Bureau No. 2 Company (in Simplified Chinese). 2023-12-28. Archived from the original on 2023-11-06. Retrieved 2024-01-05.
  7. ^ 杜娟 (2018-06-02). "穗莞深城际琶洲支线开始环评公示" [The environmental impact assessment of the Guangzhou-Shenzhen-Dongguan intercity Pazhou branch line has been made public]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2023-01-22 – via Sina Corporation.
[edit]