Rod El Farag Corridor station
Appearance
Rod El Farag Corridor محور روض الفرج | |||||
---|---|---|---|---|---|
General information | |||||
Location | Giza Governorate![]() | ||||
Line(s) | Cairo Metro Line 3 | ||||
Platforms | 1 island platform and 1 side platform | ||||
Tracks | 3 | ||||
Construction | |||||
Accessible | Yes | ||||
History | |||||
Opened | 1 January 2024 | ||||
|
Rod El Farag Corridor is the western terminus of Cairo Metro Line 3's Rod El Farag Corridor branch that opened on 1 January 2024 as part of Phase 3B of that line.[1] It is located in the El-Kom El-Ahmar area in Giza Governorate and serves a few other villages. The station is next to the corridor of the same name and is accessible from other nearby roads such as El-Zomor Canal. It is also linked to a railway station at El-Kom El-Ahmar by an overpass. It also has a car waiting area.[2] Construction of the station commenced in 2019.[3]
References
[edit]- ^ "تفاصيل محطة مترو روض الفرج بالخط الثالث.. تستقبل الركاب غدا". El Watan. 31 December 2023. Retrieved 7 May 2025.
- ^ "مترو الأنفاق يصل الكوم الأحمر فى الجيزة.. محطة مترو محور روض الفرج تخدم أوسيم ومنشأة القناطر وتربط محور الضبعة ومحطات القاهرة.. ودراسة نقل محطة السكة الحديد للربط مع المترو.. وإنشاء سلالم مشاة لخدمة الركاب". Youm7. 23 August 2023. Retrieved 7 May 2025.
- ^ "محطة روض الفرج.. نهاية رحلة الجزء الثاني من الخط الثالث للمترو". El Watan. 4 November 2023. Retrieved 7 May 2025.
30°06′07″N 31°11′04″E / 30.1019°N 31.1844°E