Jump to content

Huanggang–Huangmei high-speed railway

From Wikipedia, the free encyclopedia
Huanggang–Huangmei high-speed railway
Overview
StatusOperating
Termini
Service
Operator(s)China Railway Wuhan Group
History
Opened22 April 2022 (2022-04-22)
Technical
Line length125 km (78 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)
Route map

km
Up arrowHuanggang–Fuyang HSR to
Huangzhou and Fuyang West
Main line start
Huanggang East
Left arrowWuhan–Huangshi ICR to
Huanggang and Wuhan
Xishui South
Qichun South
Wuxue North
Main line end
Huangmei East
Huangmei South
Konglong
km

The Huanggang–Huangmei high-speed railway (Chinese: 黄黄高速铁路) is a high-speed railway line in Hubei, China. It is part of the Beijing–Hong Kong (Taipei) corridor and have a design speed of 350 kilometres per hour (220 mph).

History

[edit]

Construction on the line officially began in December 2018.[1] It had been expected to open by the end of 2021.[2] It actually opened on 22 April 2022.[3][4]

Stations

[edit]

References

[edit]
  1. ^ "湖北黄黄高铁正式开工 未来武汉到黄冈仅需15分钟" [Huanggang-Huangmei high-speed railway officially started construction in Hubei, Wuhan to Huanggang only 15 minutes in the future] (in Chinese). 10 December 2018. Retrieved 11 March 2021.
  2. ^ "明年底有望通车!湖北黄黄高铁线路建设有了新进展!" [It is expected to open by the end of next year! There has been a new progress in the construction of the Huanggang-Huangmei high-speed railway line in Hubei!] (in Chinese). 9 September 2020. Retrieved 11 March 2021.
  3. ^ "湖北黄黄高铁开通运营 武汉至华东增添新通道". China News. 2022-04-22. Retrieved 2022-09-20.
  4. ^ "黄黄高铁将于明日开通运营 武汉至黄梅仅需1.5小时到达--经济·科技". 人民网. 2022-04-21. Retrieved 2022-09-20.
  5. ^ "湖北黄冈至黄梅高速铁路正式开通运营". Xinhua News. 2022-04-22. Retrieved 2022-09-20.