Jump to content

Dahanukarwadi metro station

Coordinates: 19°12′22″N 72°50′05″E / 19.20624°N 72.83476°E / 19.20624; 72.83476
From Wikipedia, the free encyclopedia

Dahanukarwadi
Mumbai Metro station
General information
LocationKandivli, Mahatma Gandhi Nagar, Kandivli West, Mumbai, Maharashtra 400067
India
Coordinates19°12′22″N 72°50′05″E / 19.20624°N 72.83476°E / 19.20624; 72.83476
Owned by MMRDA
Operated byMaha Mumbai Metro Operation Corp. Ltd (MMMOCL)
Line(s)Yellow Line 2A
Platforms3 (1 side platform and 1 island platform)
Tracks3
Construction
Structure typeElevated, Double track
Platform levels1
Other information
Station code209
History
Opened2 April 2022 (2022-04-02)
Services
Preceding station Logo of the Mumbai Metro Mumbai Metro Following station
Kandivli (West) Yellow Line 2A Valnai–Meeth Chowky
Location
Map

Dahanukarwadi is an elevated metro station serving Dahanukarwadi neighbourhood of Kandivli on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.[1][2]

History

[edit]

J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[3] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[4] Dahanukarwadi was opened to the public on 2 April 2022, along with the first phase of Line 2A.[5][6]

Station layout

[edit]
L2 Side platform Disabled access
Platform 2
Southbound
 2A  toward Andheri (West)
Next station: Valnai–Meeth Chowky
Platform 1
Northbound
 2A  toward Dahisar (East)
Next station: Kandivli (West)
Island platform Disabled access
Platform 1A
Northbound
 2A  toward Dahisar (East)
Next station: Kandivli (West)
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
G Street level Exit/Entrance

Power and signaling system

[edit]

Like all other stations and railways of Mumbai metro, Dahanaukarwadi station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

References

[edit]
  1. ^ "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 18 April 2023.
  2. ^ "Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today". News18. 20 January 2023. Retrieved 18 April 2023.
  3. ^ "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
  4. ^ "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. 26 May 2021. Retrieved 9 July 2023.
  5. ^ "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.
  6. ^ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Retrieved 18 April 2023.