Jump to content

Chengdu–Dazhou–Wanzhou high-speed railway

From Wikipedia, the free encyclopedia
Chengdu–Dazhou–Wanzhou
high-speed railway
成达万高速铁路
Under construction near Nanchong North
Overview
StatusUnder construction
Termini
Stations13
Service
Operator(s)China Railway Chengdu Group
Technical
Line length477 km (296 mi)[1]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)

The Chengdu–Dazhou–Wanzhou high-speed railway or Chengdawan HSR (Chinese: 成达万高速铁路; pinyin: Chéngdáwàn Gāosù Tiělù) is a high-speed railway currently under construction in China. This line forms part of the Shanghai–Chongqing–Chengdu high-speed railway.

History

[edit]

This railway was planned as early as 2015.[2] Construction began on 30 September 2022.[1]

Route

[edit]

The newly built section runs between Ziyang West and Wanzhou North. Trains bound for Chengdu and Chengdu Tianfu International Airport can use the Chengdu–Yibin high-speed railway to head further northwest. The Xi'an–Chongqing high speed railway and Zhengzhou–Wanzhou high-speed railway connects to the Chengdawan HSR and allow trains to continue north to Xi'an or east to Zhengzhou.

Stations

[edit]
Station Name[1] Chinese Metro
transfers/connections
Ziyang West 资阳西 Chengdu–Yibin high-speed railway
Lezhi 乐至
Suining 遂宁
Pengxi South 蓬溪南
Nanchong North 南充北
Yingshan West 营山西
Quxian North 渠县北
Dazhou South 达州南 Xi'an–Chongqing high speed railway (Chongqing Branch)
Kaijiang South 开江南
Yuexi 岳溪
Wanzhou North 万州北 Xi'an–Chongqing high speed railway (Wanzhou Branch)

Zhengzhou–Wanzhou high-speed railway

References

[edit]
  1. ^ a b c "全线动工!成达万高铁新进展". 2022-09-30. 成达万高铁全线共设天府站、天府机场站、资阳西站、乐至站、遂宁站、蓬溪南站、南充北站、营山西站、渠县北站、达州南站、开江南站、岳溪站、万州北站等13座车站
  2. ^ "成都将新建4条出川铁路". 中国铁路成都局集团有限公司 (China Railway Chengdu Group Co., Ltd.). Retrieved 2020-12-24.