Jump to content

Canton Tower station (Tram)

Coordinates: 23°06′36″N 113°19′17″E / 23.1100694°N 113.3214618°E / 23.1100694; 113.3214618
From Wikipedia, the free encyclopedia
(Redirected from Canton Tower East station)

Canton Tower

广州塔
Guangzhou Metro
General information
LocationHaizhu, Guangzhou, Guangdong
China
Coordinates23°06′36″N 113°19′17″E / 23.1100694°N 113.3214618°E / 23.1100694; 113.3214618
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Haizhu Tram
History
Opened31 December 2014; 10 years ago (2014-12-31)[1]
1 July 2025 (rebuild)
Closed12 November 2024; 9 months ago (2024-11-12)
Services
Preceding station Guangzhou Metro Following station
Terminus Haizhu Tram Liede Bridge South
towards Wanshengwei
Location
Map

Canton Tower station (Chinese: 广州塔站),[2] formerly Canton Tower East station (广州塔东), is a station of Haizhu Tram of the Guangzhou Metro. It started operations on 31 December 2014.[1] The station was closed on 12 November 2024, and was rebuilt and reopened on 1 July 2025 as the new western terminus of the line.

Station layout

[edit]
G
Platforms
- Exits
Side platform, doors will open on the right
Platform 1 arrow for L  THZ1  towards Wanshengwei (Liede Bridge South)
Platform 2  THZ1  termination platform arrow for R
Side platform, doors will open on the right
- Exits

References

[edit]
  1. ^ a b "海珠有轨电车试验段31日10时开通试乘". Archived from the original on 30 December 2014. Retrieved 30 December 2014.
  2. ^ 李天研 (13 June 2025). "广州地铁线网图"上新",加入十、十二号线东西段". 广州日报.